Download Free The Decommissioning And Decontamination Requirements For Closing Nuclear Facilities Book in PDF and EPUB Free Download. You can read online The Decommissioning And Decontamination Requirements For Closing Nuclear Facilities and write the review.

Simple text and photographs introduce the life of George Washington Carver.
Describes the rationale and vision for the peaceful use of nuclear energy. The publication identifies the basic principles that nuclear energy systems must satisfy to fulfil their promise of meeting growing global energy demands.
This report describes and assesses radiological characterization as a precursor to decommissioning. It shows the influence of the radioactive inventory on the planning and strategies of decommissioning and also presents an extensive overview of characterization results on various reactors which have been or are being decommissioned.
Decommissioning is the last step in the lifetime management of a facility. It must also be considered during the design, construction, commissioning and operation of facilities. This publication establishes requirements for the safe decommissioning of a broad range of facilities: nuclear power plants, research reactors, nuclear fuel cycle facilities, facilities for processing naturally occurring radioactive material, former military sites, and relevant medical, industrial and research facilities. It addresses all the aspects of decommissioning that are required to ensure safety, aspects such as roles and responsibilities, strategy and planning for decommissioning, conduct of decommissioning actions and termination of the authorization for decommissioning. It is intended for use by those involved in policy development, regulatory control and implementation of decommissioning.
Cost estimation for the decommissioning of nuclear facilities can vary considerably in format, content and practice both within and across countries. These differences may have legitimate reasons but make the process of reviewing estimates complicated and the estimates themselves difficult to defend. Hence, the joint initiative of the OECD Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission (EC) was undertaken to propose a standard itemisation of decommissioning costs either directly for the production of cost estimates or for mapping estimates onto a standard, common structure for purposes of comparison. This report updates the earlier itemisation published in 1999 and takes into account experience accumulated thus far. The revised cost itemisation structure has sought to ensure that all costs within the planned scope of a decommissioning project may be reflected. The report also provides general guidance on developing a decommissioning cost estimate, including detailed advice on using the structure.
Pools or ponds are usually an integrated part of a more complex nuclear facility, but in some particular cases pools may be considered as a separate nuclear facility with a specific license. A number of nuclear installations utilize pools for the cooling of spent fuel, or the shielding of research reactor cores or irradiator sources. Over a service lifetime that can span decades, nuclear pools may become contaminated as a result of the deposition of radioactive substances. Relevant aspects of pool decommissioning covered in this publication include project planning and management, health and safety, and the management of resulting waste.
"Decommissioning activities for zero-power reactors, radio-diagnostic and radiotherapy hospital departments and laboratories and factories using radioactive material may be erroneously perceived as trivial and of low priority. This publication provides practical information, experience and assistance aimed at a broad spectrum of practitioners who are faced with decommissioning of such small nuclear facilities. Particular consideration is given to the financial and scientific resources, and early planning, which are all factors essential to efficient and effective decommissioning. It is written as a simplified, stepwise approach for guidance to nuclear operators who may have little or no experience in decommissioning. An accompanying CD contains practical information in two Annexes, including descriptions of decommissioning projects problems encountered, solutions and analyses, and lessons learned"--Provided by publisher.
This is the first report published by the IAEA which provides guidance on the preparation and implementation of the decommissioning of different types of research reactor. Different construction and operational features of research reactors have a major impact on the decommissioning techniques required. This report offers information on the conclusions drawn from a number of completed projects and identifies their similarities and differences. It is complemented by a computerized research reactor databank. Staff requirements, decommissioning costs waste activity are presented graphically according to reactor thermal power and integrated energy.