Download Free Readiness And Sustainment Of The Navys Surface Fleet Book in PDF and EPUB Free Download. You can read online Readiness And Sustainment Of The Navys Surface Fleet and write the review.

The ability of the United States Air Force (USAF) to keep its aircraft operating at an acceptable operational tempo, in wartime and in peacetime, has been important to the Air Force since its inception. This is a much larger issue for the Air Force today, having effectively been at war for 20 years, with its aircraft becoming increasingly more expensive to operate and maintain and with military budgets certain to further decrease. The enormously complex Air Force weapon system sustainment enterprise is currently constrained on many sides by laws, policies, regulations and procedures, relationships, and organizational issues emanating from Congress, the Department of Defense (DoD), and the Air Force itself. Against the back-drop of these stark realities, the Air Force requested the National Research Council (NRC) of the National Academies, under the auspices of the Air Force Studies Board to conduct and in-depth assessment of current and future Air Force weapon system sustainment initiatives and recommended future courses of action for consideration by the Air Force. Examination of the U.S. Air Force's Aircraft Sustainment Needs in the Future and Its Strategy to Meet Those Needs addresses the following topics: Assess current sustainment investments, infrastructure, and processes for adequacy in sustaining aging legacy systems and their support equipment. Determine if any modifications in policy are required and, if so, identify them and make recommendations for changes in Air Force regulations, policies, and strategies to accomplish the sustainment goals of the Air Force. Determine if any modifications in technology efforts are required and, if so, identify them and make recommendations regarding the technology efforts that should be pursued because they could make positive impacts on the sustainment of the current and future systems and equipment of the Air Force. Determine if the Air Logistics Centers have the necessary resources (funding, manpower, skill sets, and technologies) and are equipped and organized to sustain legacy systems and equipment and the Air Force of tomorrow. Identify and make recommendations regarding incorporating sustainability into future aircraft designs.
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.
The Department of Defense is likely to face years of declining resources as the U.S. government grapples with fiscal challenges. These challenges affect every account, including those associated with surface ship maintenance and operations. At the same time, there has been widespread concern that surface ship materiel readiness is declining due to a high pace of operations and a sense that there have been many instances of deferred maintenance. The need to balance fiscal reality and a continued need for ready ships is likely to be an ongoing challenge. At the request of the Assessment Division of the Office of the Chief of Naval Operations, this report: (1) determines the impact on long-term fleet readiness, Operational Availability (Ao), and Expected Service Life (ESL) caused by near-term reductions in Operations and Maintenance (O&M) accounts; (2) recommends potential strategies to minimize negative impacts to Ao and ESL and maintain the largest, most capable fleet possible; (3) develops a maintenance requirement concept, per ship class, that supports ESL, but allows for some risk within the maintenance strategy; and (4) defines the risks to Ao and ESL resulting from the new requirement. The methodology could be applicable to multiple ship classes.
This groundbreaking book examines the complex relationship between the US Navy and the American people. From the naval arms race of the early XXth century to the challenges of the Cold War, the book explores the cultural, political, and economic factors that have shaped this enduring partnership. With insightful analysis and vivid storytelling, it is a must-read for anyone interested in the history of the US Navy or American society more broadly. This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work is in the "public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.
The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.
The U.S. Navy is ready to execute the Nation's tasks at sea, from prompt and sustained combat operations to every-day forward-presence, diplomacy and relief efforts. We operate worldwide, in space, cyberspace, and throughout the maritime domain. The United States is and will remain a maritime nation, and our security and prosperity are inextricably linked to our ability to operate naval forces on, under and above the seas and oceans of the world. To that end, the Navy executes programs that enable our Sailors, Marines, civilians, and forces to meet existing and emerging challenges at sea with confidence. Six priorities guide today's planning, programming, and budgeting decisions: (1) maintain a credible, modern, and survivable sea based strategic deterrent; (2) sustain forward presence, distributed globally in places that matter; (3) develop the capability and capacity to win decisively; (4) focus on critical afloat and ashore readiness to ensure the Navy is adequately funded and ready; (5) enhance the Navy's asymmetric capabilities in the physical domains as well as in cyberspace and the electromagnetic spectrum; and (6) sustain a relevant industrial base, particularly in shipbuilding.