Download Free Mitigation Monitoring And Reporting Plan Book in PDF and EPUB Free Download. You can read online Mitigation Monitoring And Reporting Plan and write the review.

The Final Supplemental Environmental Impact Report (SEIR) (September 1992) for the Proposed Renewal of the Contract between the United States Department of Energy and The Regents of the University of California for the Operation and Management of the Lawrence Berkeley Laboratory identifies the environmental impacts associated with renewing the contract and specifies a series of measures designed to mitigate adverse impacts to the environment. This Mitigation Monitoring Plan describes the procedures the University will use to implement the mitigation measures adopted in connection with the approval of the Contract.
Metro is proposing to widen the tunnel portal currently located in the Metro Red/Purple Line Maintenance Yard (Division 20 or Santa Fe Yard). This Initial Study/Mitigated Negative Declaration (IS/MND) evaluates the potential environmental impacts that would result from the Red/Purple Line Core Capacity Improvements Project (Project) that includes widening the existing tunnel portal southeast of Union Station and constructing new tracks and switches that will allow trains to turn around quickly at Union Station.