The purpose of this study is to determine the feasibility of constructing hydropower facilities at Lock and Dam no. 8, located on the Mississippi River, near La Crosse, Wisconsin. Several alternative powerhouse schemes were investigated. The 8.75 megawatt, 10-unit plant indicated in the 1981 reconnaissance is now considered economically infeasible. Two alternate developments using tubular generating units were selected for this new study. Because of relatively low over head, the powerhouse costs are proportionally high and project feasibility falls below unity.
This report presents a preliminary evaluation of the addition of hydropower at the existing navigation Lock and Dam 7. The study shows that installation of a hydro plant with a 4,800-kW (kilowatt) or 7,200-kW nameplate rating is economical. Pertinent data concerning the site and two optional installations are given. Severe environmental impacts do not appear to be associated with construction of a plant of the sizes investigated despite the proximity of the lock and dam to an environmentally sensitive area. The District Engineer recommends that the Corps of Engineers prepare a feasibility report which can serve as a basis for congressional authorization for hydropower plant construction at Lock and Dam 7.
Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.