Download Free Combined Final Environmental Impact Statement Record Of Decision And Final Section 4f Evaluation Book in PDF and EPUB Free Download. You can read online Combined Final Environmental Impact Statement Record Of Decision And Final Section 4f Evaluation and write the review.

"The I-94 East-West Corridor study area is from 70th Street to 16th Street, a distance of about 3.5 miles. This corridor has safety issues, closely spaced interchanges, a combination of left-hand and right-hand exit and entrance ramps, and deteriorated pavement. As traffic increases, safety and traffic operations on this corridor will continue to deteriorate. By 2050, increased traffic volumes will cause nearly this entire section of I-94 to operate at level of service D to F during peak periods. The Final Environmental Impact Statement (EIS) was approved in 2016. The Final EIS evaluated the social, environmental, and economic impacts of the No-build alternative and a range of Build Alternatives, as well as the extent to which these alternatives address the project's purpose and need. WisDOT and FHWA prepared a Supplemental EIS to incorporate the most up-to-date data, updated environmental regulations, changes to the alternatives, and public and agency input since the 2016 Final EIS."-- Abstract.
Wisconsin Highway 23 is part of the National Highway System (NHS) and is a rural principal arterial that connects Fond du Lac and Sheboygan in east central Wisconsin. Both west and east ends of the project are located in growing urban areas of Fond du Lac and Plymouth. Nearly 20 miles in length, this highway corridor serves high traffic volumes near the urban areas and lower traffic volumes in rural areas. This combined Limited Scope Final Environmental Impact Statement and Record of Decision (LS SFEIS/ROD) evaluates the No- Build Alternative, several Build Alternatives, and a series of corridor preservation alternatives for future transportation improvements, and selects an alternative. The Preferred Build Alternative is the Selected Alternative and reconstructs WIS 23 to a 4-lane divided highway on the existing alignment and creates interchanges, connector roads, and a trail. Corridor roads as well as the UW 151/WIS 23 interchange.