Download Free Air Force Manpower Requirements Determination An Analysis Of Worker Nonavailability Book in PDF and EPUB Free Download. You can read online Air Force Manpower Requirements Determination An Analysis Of Worker Nonavailability and write the review.

Non-available time (NAT) is defined as that time military personnel are diverted from their occupational duties. NAT is an important parameter of the military manpower requirement determination process, yet the Services define and measure NAT differently. Although the Air Force has the most detailed approach along with the most current data base for estimating NAT, the Air Force methodology may not be the most appropriate for DoD-wide application. OASD(MRA & L) must resolve certain issues before defining a NAT policy. A Task Force is recommended to coordinate DoD-wide actions. (Author).
Within the Federal Aviation Administration (FAA), the Airway Transportation System Specialists ATSS) maintain and certify the equipment in the National Airspace System (NAS).In fiscal year 2012, Technical Operations had a budget of $1.7B. Thus, Technical Operations includes approximately 19 percent of the total FAA employees and less than 12 percent of the $15.9 billion total FAA budget. Technical Operations comprises ATSS workers at five different types of Air Traffic Control (ATC) facilities: (1) Air Route Traffic Control Centers, also known as En Route Centers, track aircraft once they travel beyond the terminal airspace and reach cruising altitude; they include Service Operations Centers that coordinate work and monitor equipment. (2) Terminal Radar Approach Control (TRACON) facilities control air traffic as aircraft ascend from and descend to airports, generally covering a radius of about 40 miles around the primary airport; a TRACON facility also includes a Service Operations Center. (3) Core Airports, also called Operational Evolution Partnership airports, are the nation's busiest airports. (4) The General National Airspace System (GNAS) includes the facilities located outside the larger airport locations, including rural airports and equipment not based at any airport. (5) Operations Control Centers are the facilities that coordinate maintenance work and monitor equipment for a Service Area in the United States. At each facility, the ATSS execute both tasks that are scheduled and predictable and tasks that are stochastic and unpredictable in. These tasks are common across the five ATSS disciplines: (1) Communications, maintaining the systems that allow air traffic controllers and pilots to be in contact throughout the flight; (2) Surveillance and Radar, maintaining the systems that allow air traffic controllers to see the specific locations of all the aircraft in the airspace they are monitoring; (3) Automation, maintaining the systems that allow air traffic controllers to track each aircraft's current and future position, speed, and altitude; (4) Navigation, maintaining the systems that allow pilots to take off, maintain their course, approach, and land their aircraft; and (5) Environmental, maintaining the power, lighting, and heating/air conditioning systems at the ATC facilities. Because the NAS needs to be available and reliable all the time, each of the different equipment systems includes redundancy so an outage can be fixed without disrupting the NAS. Assessment of Staffing Needs of Systems Specialists in Aviation reviews the available information on: (A) the duties of employees in job series 2101 (Airways Transportation Systems Specialist) in the Technical Operations service unit; (B) the Professional Aviation Safety Specialists (PASS) union of the AFL-CIO; (C) the present-day staffing models employed by the FAA; (D) any materials already produced by the FAA including a recent gap analysis on staffing requirements; (E) current research on best staffing models for safety; and (F) non-US staffing standards for employees in similar roles.
Within the Federal Aviation Administration (FAA), the Airway Transportation System Specialists ATSS) maintain and certify the equipment in the National Airspace System (NAS).In fiscal year 2012, Technical Operations had a budget of $1.7B. Thus, Technical Operations includes approximately 19 percent of the total FAA employees and less than 12 percent of the $15.9 billion total FAA budget. Technical Operations comprises ATSS workers at five different types of Air Traffic Control (ATC) facilities: (1) Air Route Traffic Control Centers, also known as En Route Centers, track aircraft once they travel beyond the terminal airspace and reach cruising altitude; they include Service Operations Centers that coordinate work and monitor equipment. (2) Terminal Radar Approach Control (TRACON) facilities control air traffic as aircraft ascend from and descend to airports, generally covering a radius of about 40 miles around the primary airport; a TRACON facility also includes a Service Operations Center. (3) Core Airports, also called Operational Evolution Partnership airports, are the nation's busiest airports. (4) The General National Airspace System (GNAS) includes the facilities located outside the larger airport locations, including rural airports and equipment not based at any airport. (5) Operations Control Centers are the facilities that coordinate maintenance work and monitor equipment for a Service Area in the United States. At each facility, the ATSS execute both tasks that are scheduled and predictable and tasks that are stochastic and unpredictable in. These tasks are common across the five ATSS disciplines: (1) Communications, maintaining the systems that allow air traffic controllers and pilots to be in contact throughout the flight; (2) Surveillance and Radar, maintaining the systems that allow air traffic controllers to see the specific locations of all the aircraft in the airspace they are monitoring; (3) Automation, maintaining the systems that allow air traffic controllers to track each aircraft's current and future position, speed, and altitude; (4) Navigation, maintaining the systems that allow pilots to take off, maintain their course, approach, and land their aircraft; and (5) Environmental, maintaining the power, lighting, and heating/air conditioning systems at the ATC facilities. Because the NAS needs to be available and reliable all the time, each of the different equipment systems includes redundancy so an outage can be fixed without disrupting the NAS. Assessment of Staffing Needs of Systems Specialists in Aviation reviews the available information on: (A) the duties of employees in job series 2101 (Airways Transportation Systems Specialist) in the Technical Operations service unit; (B) the Professional Aviation Safety Specialists (PASS) union of the AFL-CIO; (C) the present-day staffing models employed by the FAA; (D) any materials already produced by the FAA including a recent gap analysis on staffing requirements; (E) current research on best staffing models for safety; and (F) non-US staffing standards for employees in similar roles.
The ability of the United States Air Force (USAF) to keep its aircraft operating at an acceptable operational tempo, in wartime and in peacetime, has been important to the Air Force since its inception. This is a much larger issue for the Air Force today, having effectively been at war for 20 years, with its aircraft becoming increasingly more expensive to operate and maintain and with military budgets certain to further decrease. The enormously complex Air Force weapon system sustainment enterprise is currently constrained on many sides by laws, policies, regulations and procedures, relationships, and organizational issues emanating from Congress, the Department of Defense (DoD), and the Air Force itself. Against the back-drop of these stark realities, the Air Force requested the National Research Council (NRC) of the National Academies, under the auspices of the Air Force Studies Board to conduct and in-depth assessment of current and future Air Force weapon system sustainment initiatives and recommended future courses of action for consideration by the Air Force. Examination of the U.S. Air Force's Aircraft Sustainment Needs in the Future and Its Strategy to Meet Those Needs addresses the following topics: Assess current sustainment investments, infrastructure, and processes for adequacy in sustaining aging legacy systems and their support equipment. Determine if any modifications in policy are required and, if so, identify them and make recommendations for changes in Air Force regulations, policies, and strategies to accomplish the sustainment goals of the Air Force. Determine if any modifications in technology efforts are required and, if so, identify them and make recommendations regarding the technology efforts that should be pursued because they could make positive impacts on the sustainment of the current and future systems and equipment of the Air Force. Determine if the Air Logistics Centers have the necessary resources (funding, manpower, skill sets, and technologies) and are equipped and organized to sustain legacy systems and equipment and the Air Force of tomorrow. Identify and make recommendations regarding incorporating sustainability into future aircraft designs.