Published: 2008
Total Pages: 188
Get eBook
The proposed action consists of upgrading U.S. Highway 63 through the northern portion of Waterloo, Iowa. The project extends from Franklin Street to Donald Street and passes through a mix of commercial, industrial and residential land uses. U.S. 63 is also known as Logan Avenue, Mullan Avenue and 1st Street as it passes through the project corridor. The length of the project is approximately 1.6 miles. In the 1960s, the former 2-lane roadway was widened to a 53-foot, 4-lane urban roadway. This change to U.S. 63 has been the source of many proximity impacts to the surrounding neighborhoods. This project consists of upgrading U.S. 63 to a 5-lane roadway which includes center left-turn lanes, right-turn lanes at key intersections, a recreational trail and added green space adjacent to the roadway.