Download Free The Pickwick Landing Project Book in PDF and EPUB Free Download. You can read online The Pickwick Landing Project and write the review.

This report is published for the purpose of giving to the engineering profession and others interested in river-control projects the important and useful facts about the planning and construction of the Pickwick Landing Dam and Reservoir, located on the Tennessee River in western Tennessee near the Mississippi-Alabama line and constructed by the Tennessee Valley Authority, an agency of the United States Government.
This report is published for the purpose of giving to the engineering profession and others interested in river-control projects the important and useful facts about the planning and construction of the Pickwick Landing Dam and Reservoir, located on the Tennessee River in western Tennessee near the Mississippi-Alabama line and constructed by the Tennessee Valley Authority, an agency of the United States Government.
The general program for the unified development of the Tennessee River system includes 10 main-river dams, five which are now in existence. Pickwick Landing Dam is the second of the main-river dams to be constructed by the Tennessee River Authority and is located in the State of Tennessee approximately207 miles above the mouth of the river.
This report on the Guntersville project, like the companion reports published on other construction projects completed by the Tennessee Valley Authority, is intended to give the engineering profession and general public facts about the planning, design, construction, and initial operations of the Guntersville project. The report, compiled from construction data and final records contained in the Authority's files, is restricted to the more important facts concerning the development and construction of the project.
Technical Report No. 6, the Chickamauga Project, is published by the Tennessee Valley Authority to give to those interested in the development facts concerning the planning, design, construction, and initial operation of the project. The report has been written from the basic planning, design, and construction reports, correspondence, and other data contained in the Authority's files. Content has been reduced to a minimum, commensurate with the many phases of the work. Unusual and unprecedented features and methods have been described in some detail while common procedures have been described rather briefly.