James E. Ayer
Published: 1961
Total Pages: 50
Get eBook
The need for the first core for EBR-II resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuel-element-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area.