Download Free Supplement Analysis For The Transmission System Vegetation Management Program Feis Doe Book in PDF and EPUB Free Download. You can read online Supplement Analysis For The Transmission System Vegetation Management Program Feis Doe and write the review.

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways.
BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attachment. BPA is clearing the danger trees to prevent them from falling or growing into the lines causing outages. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (EIS) and Record of Decision (ROD). The planning step are described in the attached checklist. This Supplement Analysis finds that (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD, and; (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.
Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. See Section 1 of the attached checklist for a complete description of the proposal.
Vegetation Management along the Monroe-Custer No. 1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No. 2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor.
Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the subject transmission line.
BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action.
Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7. Bonneville Power Administration proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors.
Vegetation Management along the St. John's - Keeler 115 kV Transmission Line Corridor from 3/1 to 10/6. This corridor includes portions of the Oregon City - Keeler No 2 115 kV transmission line. The corridor along this section of the proposed project is 100 feet in width.
BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards.