Published: 1976
Total Pages:
Get eBook
This report is one of many supporting documents used by the Nuclear Regulatory commission in the preparation of the Nuclear Energy Center Site Survey (NECSS) mandated by Congress. While the overall study focuses on the feasibility and practicability of nuclear energy centers (NECs), this report is directed towards choosing a suitable surrogate site in the upper St. Lawrence region of New York State, assessing the probable impacts associated with construction and operation of the NEC, and comparing these impacts with those associated with small dispersed nuclear power stations. The upper St. Lawrence region is surveyed to identify a specific site that might be suitable for a surrogate NEC. Several assumptions about the basic design of an NEC are delineated, and a general overview of the characteristics of the region is given. The Fort Drum Military Reservation is chosen as a suitable surrogate site. Fort Drum and the surrounding area are described in terms of land use and population patterns, terrestrial and aquatic ecology, water use and quality, meteorology, institutional framework, and socioeconomic structure. The impacts associated with NEC development are assessed. Then the impacts associated with smaller dispersed nuclear power stations located throughout New York State are assessed and compared with the impacts associated with the NEC. Finally, the impacts due to development of the transmission line networks associated with the NEC and with the dispersed power stations are assessed and compared.