Download Free Spill Prevention Control And Countermeasure Spcc Plan Book in PDF and EPUB Free Download. You can read online Spill Prevention Control And Countermeasure Spcc Plan and write the review.

The main objective of the project during the summer internship at CalPortland Company was creating "Spill Prevention, Control and Countermeasure (SPCC) Plan" for the company's Colton aggregate plant. The SPCC plan is required by 40 CFR Section 112, oil pollution prevention, of the Environmental Protection agency in order to prevent the discharge of oil from non-transportation-related onshore and offshore facilities into or upon the navigable waters of the United States or adjoining shorelines ("ECFR---code of federal regulations," 2016). Previously, CalPortland company's Colton plant operated as a cement plant until it was permanently shut down in the year of 2009, and many documents have been lost or misplaced ever since. Since then the plant restarted operations but this time as an aggregates plant which still requires an SPCC plan since it stores and uses oil products that are in the amounts requiring current SPCC plan. Thus, as an environmental engineering intern I was assigned to study all of the rules, and regulations set by environmental protection agency for the preparation and implementation of "Spill Prevention, Control and Countermeasure Plan" which eventually became company's official plan after it was approved and signed by my internship mentor, Licensed Engineer Desirea Haggard.
This manual guides Navy areas in developing and implementing their Spill Prevention, Control, and Countermeasure plan (SPCC Plan) for oil and hazardous substances (HS). This document is required by the Environmental Protection Agency (EPA) Part 40 of the Code of Federal Regulation, Section 112 (20 CFR 112), the Oil Pollution Prevention regulation, and OPNAVINST 5090.1B, for oil area meeting the criteria in 40 CFR 112. Spill control measures are required for hazardous waste (HW) storage areas regulated by either 40 CFR 264 or 40 CFR 265. Additionally, some spill control measures are required for underground storage tanks (UST) regulated by 40 CFR 280. HW storage areas, not specifically regulated by the above referenced regulations, do not have regulated spill control requirements; however, it is considered best engineering practice to have spill control measures at all HS storage areas. Therefore, it is recommended that all HS storage areas be included in Navy SPCC plans. For overseas locations please refer to OEBGD/FGS criteria for spill prevention guidance.
Oil Pollution Prevention - Spill Prevention, Control, and Countermeasure Plan Requirements - Amendments, December 26, 2006 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Oil Pollution Prevention - Spill Prevention, Control, and Countermeasure Plan Requirements - Amendments, December 26, 2006 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA or the Agency) is amending the Spill Prevention, Control, and Countermeasure (SPCC) Plan requirements by: first, providing the option for owners and operators of facilities that store 10,000 gallons of oil or less and meet other qualifying criteria to self-certify their SPCC Plans in lieu of review and certification by a Professional Engineer; second, providing an alternative to the general secondary containment requirement without requiring a determination of impracticability for facilities that have particular types of oil-filled equipment; third, defining and exempting particular vehicle fuel tanks and other on-board bulk oil storage containers used for motive power; and fourth, exempting mobile refuelers from the sized secondary containment requirements for bulk storage containers. The Agency also is removing and reserving the SPCC requirements for animal fats and vegetable oils that are specific to onshore oil production facilities, onshore oil drilling and workover facilities, and offshore oil drilling, production, or workover facilities. Finally, the Agency is extending the SPCC compliance dates for farms. These changes significantly reduce the burden imposed on the regulated community for complying with the SPCC requirements, while maintaining protection of human health and the environment. In a separate document in this Federal Register, the Agency is proposing to extend the compliance dates for all facilities. This book contains: - The complete text of the Oil Pollution Prevention - Spill Prevention, Control, and Countermeasure Plan Requirements - Amendments, December 26, 2006 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section