Manuel Padron & Associates
Published: 1999
Total Pages:
Get eBook
"This report describes proposed bus and LRT operations plans for the Southeast Corridor project. The bus and rail operations plans support the alternatives that are required to be carried forward in the PE/EIS phase of the project. The alternatives consists of a No-Biuld, TSM and LRT Build Alternative."--Introduction.