Download Free Rcra Ground Water Assessment Plans And Annual Ground Water Quality Assessment Reports At Interim Status Facilities Book in PDF and EPUB Free Download. You can read online Rcra Ground Water Assessment Plans And Annual Ground Water Quality Assessment Reports At Interim Status Facilities and write the review.

The Resource Conservation and Recovery Act (RCRA) regulates waste management activities at hazardous waste management facilities. Whenever a facility becomes subject to regulation under RCRA, the facility owner or operator is required to notify the US Environmental Protection Agency (EPA) of hazardous waste activity and within 30 days submit the initial ''Part A'' portion of an operating permit application [RCRA {section} 3010] to EPA or to the State authorized to operate a hazardous waste management program in lieu of EPA. A facility that has submitted its Part A application is defined as having ''interim status, '' and is subject to the regulations in 40 CFR Part 265. Interim status facilities that contain hazardous waste landfills, surface impoundments, or land treatment facilities are required by 40 CFR 265 Subpart F to implement a groundwater monitoring program that consists of several phased monitoring activities and is capable of determining the facility's impact on the quality of ground water in the uppermost aquifer underlying the facility. This information brief is the fourth in a series on the general topic of groundwater monitoring requirements under RCRA at interim status and permitted facilities. This information brief focuses on the last phase of activities, implementation of an Assessment Program, and highlights recordkeeping and reporting requirements.
Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.
Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.
Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between November 20 and February 25, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.