This fifth edition provides a comprehensive resource for project managers. It describes the latest project management systems that use critical path methods.
This systems approach to project management aims to develop the reader's professional skills and thinking in the planning and control component of project work.
There is a narrow view of control which is about delivering projects in accordance with their plans, using disciplines like earned value and risk management already championed by APM. That view is about doing projects right. This Introduction to Project Control offers a wider perspective, which includes doing the right projects. It involves integrating all the disciplines of project management.
Since the second edition of Project Planning & Control in 1991, major changes have taken place in the way managers approach the problems of planning and control of engineering and industrial projects. This Third Edition of Project Planning and Control describes the latest project management systems that use critical path methods. A detailed examination of one widely used system illustrates the general characteristics of modern project planning software. Descriptions of Microsoft Project and the Hornet Project Management System are also featured, as well as a discussion of the importance of integrating Network Analysis with Earned Value Analysis (EVA), giving real life examples. Reviews of previous editions: "It is an extremely well written and illustrated book that is easy to read. It will be bought and used by a wide range of engineers from students to the qualified, and by a wide range of professions." - Engineering World "An excellent book written with wit and clarity, it should be read eagerly by the managing director as well as the engineering trainee" - The Engineer "Most welcome to students and managers who seek a better understanding of the subject and to sharpen their performance" - The Cost Engineer
Critical Path Method (CPM) and Performance Evaluation and ReviewTechnique (PERT) are widely recognized as the most effectivemethods of keeping large, complex construction projects onschedule, under budget, and up to professional standards. But thesemethods remain underused because they are poorly understood and,due to a host of unfamiliar terms and applications, may seem morecomplicated than they really are. This encyclopedia brings together, in one comprehensive volume, allterms, definitions, and applications related to the time and costmanagement of construction projects. While many of these termsrefer to ancient and venerable building practices, others haveevolved quite recently and refer specifically to modernconstruction and management techniques. Sources include hundreds ofprofessional books, trade journals, and research publications, aswell as planning and scheduling software vendor literature. The detailed glossary of all applicable terms includes across-referenced listing of examples that describe real-worldapplications for each term supplied. An extensive bibliographycovers all applicable books, articles, and periodicals available onproject planning, scheduling, and control using CPM and relatedsubjects. This book is an important quick reference and desktop informationresource for construction planners, schedulers, and controllers, aswell as civil engineers and project managers. It is also theultimate research tool for educators, students, or anyone who seeksto improve their understanding of the management of modernconstruction projects.
This is the only book that makes all planning methods and tools available to project managers at all levels easy to understand ... and use. Instead of applying techniques piecemeal, you'll take a cohesive, step-by-step approach to improve strategic and operational planning and scheduling throughout the organization. You'll master advanced scheduling techniques and tools such as strategic planning models and critical chain and enterprise project management. Includes time-and-error-saving checklists.
The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.
Project management can be defined as a way of developing structure into a complex situation. Effective planning and control of projects requires a panoramic view and logical thinking. This text provides an overview of the subject.