Download Free Project Management With Dynamic Scheduling Book in PDF and EPUB Free Download. You can read online Project Management With Dynamic Scheduling and write the review.

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves. The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.
Through the use of best practices, helpful screen shots, hands-on exercises, and review questions, this book instructs you on how to build dynamic schedules with Microsoft Project 2010 that will allow you to explore 'what if?' scenarios and decrease the time you spend making static schedule changes.
Discover solutions to common obstacles faced by project managers. Written as a business novel, the book is highly interactive, allowing readers to participate and consider options at each stage of a project. The book is based on years of experience, both through the author's research projects as well as his teaching lectures at business schools. The book tells the story of Emily Reed and her colleagues who are in charge of the management of a new tennis stadium project. The CEO of the company, Jacob Mitchell, is planning to install a new data-driven project management methodology as a decision support tool for all upcoming projects. He challenges Emily and her team to start a journey in exploring project data to fight against unexpected project obstacles. Data-driven project management is known in the academic literature as “dynamic scheduling” or “integrated project management and control.” It is a project management methodology to plan, monitor, and control projects in progress in order to deliver them on time and within budget to the client. Its main focus is on the integration of three crucial aspects, as follows: Baseline Scheduling: Plan the project activities to create a project timetable with time and budget restrictions. Determine start and finish times of each project activity within the activity network and resource constraints. Know the expected timing of the work to be done as well as an expected impact on the project’s time and budget objectives. Schedule Risk Analysis: Analyze the risk of the baseline schedule and its impact on the project’s time and budget. Use Monte Carlo simulations to assess the risk of the baseline schedule and to forecast the impact of time and budget deviations on the project objectives. Project Control: Measure and analyze the project’s performance data and take actions to bring the project on track. Monitor deviations from the expected project progress and control performance in order to facilitate the decision-making process in case corrective actions are needed to bring projects back on track. Both traditional Earned Value Management (EVM) and the novel Earned Schedule (ES) methods are used. What You'll Learn Implement a data-driven project management methodology (also known as "dynamic scheduling") which allows project managers to plan, monitor, and control projects while delivering them on time and within budget Study different project management tools and techniques, such as PERT/CPM, schedule risk analysis (SRA), resource buffering, and earned value management (EVM) Understand the three aspects of dynamic scheduling: baseline scheduling, schedule risk analysis, and project control Who This Book Is For Project managers looking to learn data-driven project management (or "dynamic scheduling") via a novel, demonstrating real-time simulations of how project managers can solve common project obstacles
This handbook is a unique, comprehensive resource for professional project managers and students in project management courses that focuses on the integration between baseline scheduling, schedule risk analysis and project control, also known as Dynamic Scheduling or Integrated Project Management and Control. It contains a set of more than 70 articles. Each individual article focuses on one particular topic and features links to other articles in this book, where appropriate. Almost all articles are accompanied with a set of questions, the answers to which are provided at the end of the book. This book is accompanied by and is based on the Project Management Knowledge Center (www.pmknowledgecenter.com), an online learning platform for Integrated Project Management.
Microsoft Office Project 2003 is a powerful software tool, and like all tools, it requires knowledge and skill to be used to its maximum potential. This fully revised new edition of Eric Uyttewaal's best-selling book on Microsoft Project provides users with everything they will need to more easily and effectively manage projects to a successful conclusion. Dynamic Scheduling with Microsoftr Office Project 2003: The Book By and For Professionals is not only written by a certified PMP and project management practitioner with over 17 years of experience using and teaching MS Project, but is also based on the cumulative experience of the author's clients, other instructors, and includes insights from numerous other professionals who have used MS Office Project successfully.
Microsoft Project 2013 is a powerful software tool, and like all tools it requires knowledge and skill to be used to its maximum potential. This fully revised new edition provides users with everything they will need to more easily and effectively manage projects to a successful conclusion. Designed for the busy, practicing project manager, Dynamic Scheduling With Microsoft Project 2013 will help you get up to speed quickly with the new and enhanced features of Project 2013 (including Project Pro for Office 365) and enable you to create effective schedules using best practices, tips & tricks, and step-by-step instruction. Through the use of helpful screenshots, hands-on exercises, illustrations, and review questions, this guide instructs you on how to build dynamic schedules that will allow you to explore what-if scenarios and dramatically decrease the time you spend making static schedule changes. "A must read, reread, and use daily for all project managers" is what PMI's Project Management Journal had to say about the previous edition. This updated version is even better! Key Features Fully aligned with the PMBOK Guide - Fifth Edition, The Practice Standard for Work Breakdown Structures - Second Edition, The Practice Standard for Scheduling - Second Edition, and The Practice Standard for Earned Value Management - Second Edition by the Project Management Institute Validated training material for the new Microsoft Certification Exam 74-343: Managing Projects with Microsoft Project 2013 Captures the best practices and insights that have been gained from thousands of real-life schedules and years of training project managers across all industries WAV offers downloadable exercise files, a glossary of terms, filters to check your own project, an advance topics appendix, and a solutions manual for college professors available from the Web Added Value Download Resource Center at www.jrosspub.com.
This book presents an integrated approach to monitoring projects in progress using Earned Value and Earned Schedule Management combined with Schedule Risk Analysis. Monitoring and controlling projects involves processes for identifying potential problems in a timely manner. When necessary, corrective actions can be taken to exploit project opportunities or to get faltering projects back on track. The prerequisite is that project performance is observed and measured regularly to identify variances from the project baseline schedule. Therefore, monitoring the performance of projects in progress requires a set of tools and techniques that should ideally be combined into a single integrated system. The book offers a valuable resource for anyone who wants to understand the theory first and then to use it in practice with software tools. It is intended for students, professionals and academics with an interest and/or experience in running projects as well as for newcomers in the area of project control with a basic grasp of the Earned Value, Earned Schedule and Schedule Risk Analysis concepts.
An easy-to-follow guide to the theory and practice of project scheduling and control No matter how large or small the construction project, an efficient, well-thought-out schedule is crucial to achieving success. The schedule manages all aspects of a job, such as adjusting staff requirements at various stages, overseeing materials deliveries and equipment needs, organizing inspections, and estimating time needs for curing and settling—all of which requires a deep understanding on the part of the scheduler. Written by a career construction professional, Construction Project Scheduling and Control, Second Edition has been fully revised with up-to-date coverage detailing all the steps needed to devise a technologically advanced schedule geared toward streamlining the construction process. Solved and unsolved exercises reinforce learning, while an overview of industry standard computer software sets the tone for further study. Some of the features in this Second Edition include: Focus on precedence networks as a viable solution to scheduling, the main part of project control The concepts of Dynamic Minimal Lag, a new CPM technique developed by the author A new chapter on schedule risk management By combining basic fundamentals with advanced techniques alongside the robust analysis of theory to enhance real-world applications, Construction Project Scheduling and Control is an ideal companion for students and professionals looking to formulate a schedule for a time-crunched industry in need of better ways to oversee projects.
Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practitioners as well as scientists working in the field of project management. The book is divided into two parts. In Part I, the project management process is described and the management tasks to be accomplished during project planning and control are discussed. This allows for identifying the major scheduling problems arising in the planning process, among which the resource-constrained project scheduling problem is the most important. Part II deals with efficient computer-based procedures for the resource-constrained project scheduling problem and its generalized version. Since both problems are NP-hard, the development of such procedures which yield satisfactory solutions in a reasonable amount of computation time is very challenging, and a number of new and very promising approaches are introduced. This includes heuristic procedures based on priority rules and tabu search as well as lower bound methods and branch and bound procedures which can be applied for computing optimal solutions.