Excerpt from Oversight of Pending Public Building Projects: Hearing Before the Subcommittee on Water Resources, Transportation, Public Buildings, and Economic Development of the Committee on Environment and Public Works United States Senate, One Hundred Third Congress, First Session, November 18, 1993 Let me start by thanking Roger Johnson, the Administrator of gsa, for appearing here today and bringing along his team, which has been very cooperative. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.
This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work. This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.
Recurrent problems with project performance in the U.S. Department of Energy (DOE) in the 1990s raised questions in Congress about the practices and processes used by the department to manage projects. The 105th Committee of Conference on Energy and Water Resources directed DOE to investigate establishing a project review process. Many of the findings and recommendations in this series of reports identified the need for improved planning in the early project stages (front-end planning) to get the project off to the right start, and the continuous monitoring of projects by senior management to make sure the project stays on course. These reports also stressed the need for DOE to act as an owner, not a contractor, and to train its personnel to function not as traditional project managers but as knowledgeable owner's representatives in dealing with projects and contractors. The NRC Committee for Oversight and Assessment of Department of Energy Project Management determined that it would be helpful for DOE to sponsor a forum in which representatives from DOE and from leading corporations with large, successful construction programs would discuss how the owner's role is conducted in government and in industry. In so doing, the committee does not claim that all industrial firms are better at project management than the DOE. Far from it-the case studies represented at this forum were selected specifically because these firms were perceived by the committee to be exemplars of the very best practices in project management. Nor is it implied that reaching this level is easy; the industry speakers themselves show that excellence in project management is difficult to achieve and perhaps even more difficult to maintain. Nevertheless, they have been successful in doing so, through constant attention by senior management.
In the U.S., four in ten public infrastructure projects report delays or cost overruns. To tackle this problem, regulators often scrutinize the project contractor's operations. We investigate the causal effect of government oversight on project efficiency by gleaning 262,857 projects that span seventy-one U.S. federal agencies and 54,739 contractors. Our identification strategy exploits a regulatory bylaw: if a project's anticipated budget exceeds a threshold value, the contractor's operations are subject to surveillance from independent procurement officers; otherwise, these operational checks are waived. Using a regression discontinuity design, we find that oversight is obstructive to the project's operations, especially when the contractor (i) has no prior experience in public projects, (ii) is paid with a fixed-price contract that includes performance-based incentives, and (iii) performs a labor-intensive task. In contrast, oversight is least obstructive -- or beneficial -- when the contractor (i) is experienced, (ii) is paid with a time-and-materials contract, and (iii) performs a machine-intensive task.