Download Free National Register Evaluation Of Eight Sites At Camp Swift Army National Guard Training Center Bastrop County Texas Book in PDF and EPUB Free Download. You can read online National Register Evaluation Of Eight Sites At Camp Swift Army National Guard Training Center Bastrop County Texas and write the review.

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.
In response to everchanging global security requirements, the U.S. National Command Authority is reorganizing its force structure throughout the world. National defense planners are proposing to reduce, over the next several years, the overall military forces of the United States. As the number of Active Component soldiers and airmen decreases, the importance of Reserve Component soldiers and airmen to the overall defense of the nation increases. To meet the needs of the restructured Army, staff at the Camp Grayling Army National Guard Training Site proposed implementing three Master Plan projects. Included in this proposed action are the construction of two logistic support facilities, and a state-of-the-art armor training facility, the Multi-Purpose Range Complex-Heavy-Reduced (MPRC-H-R). An Environmental Impact Statement (EIS) was prepared to assess the impacts of these construction projects. This Final EIS was filed with the Environmental Protection Agency in June 1994. The Record of Decision issued in August 1994 selected to implement all three installation Master Plan projects as proposed. (AN).