BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.
"... identifies strategies that have been successfully used to expedite the planning and environmental review of transportation and some nontransportation projects within the context of existing laws and regulations. The report also identifies 16 common constraints on project delivery and 24 strategies for addressing or avoiding the constraints. While the strategies and constraints are associated with planning and environmental review, many of the strategies are also applicable to design and construction. Results of SHRP 2 Report S2-C19-RR-1 have been incorporated into the Transportation for Communities-Advancing Projects through Partnerships (TCAPP) website."--Provided by publisher.