Download Free Jackson Hole Flood Control Project Snake River Wyoming Design Memorandum No1 General Design Memorandum Book in PDF and EPUB Free Download. You can read online Jackson Hole Flood Control Project Snake River Wyoming Design Memorandum No1 General Design Memorandum and write the review.

This history explores the story of federal contributions to dam planning, design, and construction by carefully selecting those dams and river systems that seem particularly critical to the story. The history also addresses some of the negative environmental consequences of dam-building, a series of problems that today both Reclamation and the U.S. Army Corps of Engineers seek to resolve.
Explores the story of Federal contributions to dam planning, design, and construction.
TRB's National Cooperative Highway Research Program (NCHRP) Report 568: Riprap Design Criteria, Recommended Specifications, and Quality Control examines design guidelines; recommended material specifications and test methods; recommended construction specifications; and construction, inspection, and quality control guidelines for riprap for a range of applications, including revetment on streams and riverbanks, bridge piers and abutments, and bridge scour countermeasures such as guide banks and spurs.
This study was conducted to identify methods that have been used in the repair and rehabilitation of concrete dams. Information was obtained through literary searches, discussions with project personnel, and visits to project sites. Each case history includes a background of the project, the deficiency that necessitated repair or rehabilitation, and descriptions of materials and methods used in the repair or rehabilitation. When available, the cost of the repair project and the performance of the repair to date have been included. Case histories included in this report cover a range of deficiencies in concrete structures, including cracking, spalling, erosion, leakage, inadequate PMF capacity, expansion resulting from alkali-aggregate reaction, instability, and insufficient storage capacity.
TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 305: Interaction Between Roadways and Wildlife Ecology summarizes existing information related to roadway planning, design, construction, operation, and maintenance practices being used successfully and unsuccessfully, nationally and internationally, to accommodate wildlife ecology given the challenging background of rapid growth and diminishing natural resources.
Adaptive management is an approach to managing social-ecological systems that fosters learning about the systems being managed and remains at the forefront of environmental management nearly 40 years after its original conception. Adaptive management persists because it allows action despite uncertainty, and uncertainty is reduced when learning occurs during the management process. Often termed “learning by doing”, the allure of this management approach has entrenched the concept widely in agency direction and statutory mandates across the globe. This exceptional volume is a collection of essays on the past, present and future of adaptive management written by prominent authors with long experience in developing, implementing, and assessing adaptive management. Moving forward, the book provides policymakers, managers and scientists a powerful tool for managing for resilience in the face of uncertainty.