California. Department of Transportation
Published: 1978*
Total Pages: 74
Get eBook
Caltran's engineering personnel have completed sketch design studies and prepared 1978 cost estimates for the basic alternatives approved by the Steering Committee at a May 31,1978 meeting. Ten alternatives reviewed for Sacramento encompass four separate transportation modes: freeway, bicycle, high occupancy vehicle (HOV) and light rail. Some of the modes considered were evaluated individually as well as together with other transportation modes.