Download Free Interim Report No 3 Wabash River Basin Comprehensive Study Indiana Illinois And Ohio Book in PDF and EPUB Free Download. You can read online Interim Report No 3 Wabash River Basin Comprehensive Study Indiana Illinois And Ohio and write the review.

Considers S. 1144 and related bills, to authorize Army Corps of Engineers construction of 15 flood control and water resources development projects, pt.1; Considers S. 537, to amend the Flood Control Act to authorize funds for Army Corps of Engineers river bank stabilization and flood control project on the Missouri River below Garrison Dam in North Dakota, pt.2; Considers Army Corps of Engineers flood control project on the Tanana River at Fairbanks, harbor development project at Kake Harbor, and navigation project at the Sergius and Whitestone Narrows in Alaska. Focuses on Tanana River project in wake of August 1967 flood, pt.3.