Download Free Final Remedial Investigation Feasibility Study Report Ndnods Fort Tuthill Small Arms Range North Aedb R Site Id Azhq 005 R 01 Book in PDF and EPUB Free Download. You can read online Final Remedial Investigation Feasibility Study Report Ndnods Fort Tuthill Small Arms Range North Aedb R Site Id Azhq 005 R 01 and write the review.

This Quality Control Plan has been prepared to address the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) Addendum activities and a Change Order to Delivery Order No. 0009 dated July 15, 1993, at the Fort George G. Meade (FGGM). It has been prepared for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA), to fulfill the requirement of deliverable ELIN A004 under Task Order 0009 of TEPS contract DAAA15-9l-D-00l6. It has been developed in accordance with the USATHAMA Quality Assurance Program, USATHAMA Geotechnical Requirements, and Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.
This Final Report for Operable Unit 5 (OU 5) is provided per the statement of work for the Remedial investigation/Feasibility Study for (RI/FS) OU 5. The RI portion of the report covers the site background, field investigations, nature and extent of contamination, conceptual model, and baseline risk assessment. The purpose of the RI is to define the contamination at OU 5 and the effects of the contamination on human health and the environment. The FS covers: (1) remedial action objectives, (2) an identification and screening of potentially applicable technologies, (3) a development and screening of alternatives which combine these technologies, and (4) a detailed analysis of the most applicable alternatives. The analysis considers the nine CERCLA evaluation criteria. The alternatives are evaluated according to their combined effectiveness, implementability, and cost scores. Based on the analysis, the most cost-effective alternatives are identified. Remedial action objectives, ARARs, Detailed analysis of alternatives, Operable Unit 5, Remedial investigation/feasibility study, Elmendorf AFB, Alaska.