Published: 1976
Total Pages:
Get eBook
Environmental monitoring data for the years 1973, 1974 and 1975 pertaining to the Kewaunee Plant, which began operation in mid-1974, were analyzed by qualitative and quantitative methods. The results showed no significant immediate deleterious effects, thus confirming preoperational predictions. Although the plant has not operated long enough to reveal long-term deleterious effects, the present indications do not lead to a prediction that any are developing. The data acquired, method of analysis, and results obtained are presented in detail along with recommendations for improving monitoring techniques.