Download Free Draft Environmental Assessment For Land Acquisition Construction And Operation Of New Hampshire Regional Training Institute 195th Training Regiment New Hampshire Army National Guard Book in PDF and EPUB Free Download. You can read online Draft Environmental Assessment For Land Acquisition Construction And Operation Of New Hampshire Regional Training Institute 195th Training Regiment New Hampshire Army National Guard and write the review.

"The purpose of the proposed action is to ensure that effective, long-term natural resource conservation measures and military activities on mission land are integrated and consistent with federal stewardship requirements." --From Project Purpose and Need.
"The purpose of the proposed action is to construct a range facility in order to provide the NHARNG units the opportunity to fulfill their marksmanship requirements as identified in the Department of the Army pamphlet 350-38 in Standards Training Commission dated 18 November 2013, without the need for travel to installations located outside the state of New Hampshire." --SP-ii.
This environmental assessment (EA) evaluates the potential environmental, cultural, and socioeconomic effects associated with contruction and operation of a proposed field maintenance shop (FMS) in Hooksett, New Hampshire (NH) to support the mission requirements of the New Hampshire Army National Guard (NHARNG).
"This Environmental Assessment (EA) evaluated the potential environmental, socioeconomic, and cultural effects associated with the construction of a Readiness Center (RC) at 96 Sheep Davis Road in Pembroke, New Hampshire ... the potential effects of the Proposed Action and No Action Alternative are analyzed. This EA will facilitate the decision process regarding the Proposed Action and its alternatives"--Page 2 of cover.
This document is an environmental assessment for the construction and use of a multipurpose transition firing range by the Washington Army National Guard (WAARNG) at the Yakima Training Center (YTC), Washington.