Download Free Changeable Message Sign Visibility Final Report Book in PDF and EPUB Free Download. You can read online Changeable Message Sign Visibility Final Report and write the review.

The object of this contract was to identify problems with the visibility of changeable message signs (CMSs), particularly for older drivers, and to develop design guidelines and operational recommendations to ensure adequate conspicuity and legibility of in-service CMSs. This project was divided into three main sections: a field survey of in-use CMSs, a series of laboratory experiments and static field studies, and a partially controlled dynamic field study. The research was designed to optimize CMS components, including the character variables (font, width-to-height ratio, color, and contrast orientation) and the message variables (inter-letter, inter-word, and inter-line spacing).
This document presents a synthesis of current information and operating practices related to roadside safety and is developed in metric units. The roadside is defined as that area beyond the traveled way (driving lanes) and the shoulder (if any) of the roadway itself. The focus of this guide is on safety treatments that minimize the likelihood of serious injuries when a driver runs off the road. This guide replaces the 1989 AASHTO "Roadside Design Guide."
Portable Changeable Message Sign (PCMS) systems used in work zones are programmable supplementary traffic control devices that display messages composed of letters, symbols or both and provide information and instructions to the traveling public approaching work zone activities. The study seeks to develop warrants and criteria for PCMS deployment in Illinois highway work zones. It is recommended that PCMS systems be used during long- and intermediate-term stationary work, for traffic control through incident areas, and in projects where advance-time notification is needed. The discussion focuses on spacing criteria, number of signs required, sign visibility and message legibility, text alignment, distance criteria, message length, duration and type, project-level operational guidelines, message storage and dissemination, repair, maintenance and utility costs, as well as control and coordination issues. The study concludes that additional research is needed in order to: develop a comprehensive standardized statewide database of messages and message abbreviations; develop a comprehensive repository with information about the technology of the various components of the PCMS units; coordinate PCMS units used in highway work zones with a corridor or regional ATMS system; and maintain information about the use of a PCMS unit in a work zone project and possibly integrate it with other relevant information in a management system.