Download Free Air Quality State Implementation Plans Approvals And Promulgations Arizona Second 10 Year Sulfur Dioxide Maintenance Plans Us Environmental Protection Agency Regulation Epa 2018 Edition Book in PDF and EPUB Free Download. You can read online Air Quality State Implementation Plans Approvals And Promulgations Arizona Second 10 Year Sulfur Dioxide Maintenance Plans Us Environmental Protection Agency Regulation Epa 2018 Edition and write the review.

Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Second 10-Year Sulfur Dioxide Maintenance Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Second 10-Year Sulfur Dioxide Maintenance Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is approving the second 10-year maintenance plans for the Ajo and Morenci areas in Arizona for the 1971 National Ambient Air Quality Standards (NAAQS or "standards") for sulfur dioxide (SO 2), and correcting an error in the description of the Ajo SO 2 maintenance area in the Code of Federal Regulations. Elsewhere in this Federal Register, we are proposing approval and soliciting written comment on these actions. If we receive adverse comments on this direct final rule, resulting in withdrawal of the entire rule or any part(s) of it, we will address those comments when we finalize the proposal. The EPA does not plan to institute a second comment period on this action. Any parties interested in commenting must do so at this time. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Second 10-Year Sulfur Dioxide Maintenance Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Approvals, Disapprovals and Promulgations of Air Quality Implementation Plans - Arizona - Regional Haze State and Federal Implementation Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approvals, Disapprovals and Promulgations of Air Quality Implementation Plans - Arizona - Regional Haze State and Federal Implementation Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to approve in part and disapprove in part a portion of Arizona's State Implementation Plan (SIP) submittal for its regional haze program and to promulgate a Federal Implementation Plan (FIP) for the disapproved elements of the SIP. The State and Federal plans are to implement the regional haze program in Arizona for the first planning period through 2018. This final rule addresses only the portion of the SIP related to Arizona's determination of Best Available Retrofit Technology (BART) to control emissions from eight units at three electric generating stations: Apache Generating Station, Cholla Power Plant and Coronado Generating Station. Consistent with our proposal, EPA approves in this final rule the State's determination that the three sources are subject to BART, and approves the State's emissions limits for sulfur dioxide (SO 2) and particulate matter less than or equal to 10 micrometers (PM 10) at all the units, but disapproves Arizona's BART emissions limits for nitrogen oxides (NO X) at the coal-fired units of the three power plants. We also are promulgating a FIP that contains new emissions limits for NO X at these coal-fired units and compliance schedules for implementation of BART as well as requirements for equipment maintenance, monitoring, recordkeeping and reporting for all units and all pollutants at the three sources. In today's action, we are revising some elements of the proposed FIP in response to comments and additional information that we received. This book contains: - The complete text of the Approvals, Disapprovals and Promulgations of Air Quality Implementation Plans - Arizona - Regional Haze State and Federal Implementation Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Approval and Promulgation of Air Quality Implementation Plans - Designation of Areas for Air Quality Planning Purposes - Arizona - Miami Sulfur Dioxide (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approval and Promulgation of Air Quality Implementation Plans - Designation of Areas for Air Quality Planning Purposes - Arizona - Miami Sulfur Dioxide (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking direct final action under the Clean Air Act to approve the Miami Sulfur Dioxide Nonattainment Area State Implementation and Maintenance Plan as a revision to the Arizona state implementation plan. The Arizona Department of Environmental Quality developed this plan to maintain the sulfur dioxide national ambient air quality standards in the Miami (Gila County) area. The maintenance plan contains various elements, including contingency provisions that will be implemented if measured ambient concentrations of sulfur dioxide are above certain trigger levels. EPA is also approving the State of Arizona's request for redesignation of the Miami area from nonattainment to attainment for the sulfur dioxide standards. Lastly, EPA is correcting the boundary of the Miami sulfur dioxide nonattainment area to exclude a noncontiguous township that was erroneously included in the description of the area and to fix a transcription error in the listing of one of the other townships. This book contains: - The complete text of the Approval and Promulgation of Air Quality Implementation Plans - Designation of Areas for Air Quality Planning Purposes - Arizona - Miami Sulfur Dioxide (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Payson PM10 Air Quality Planning Area (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Payson PM10 Air Quality Planning Area (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 Pursuant to the Clean Air Act (CAA), the Environmental Protection Agency (EPA) is approving a revision to the Payson portion of the Arizona State Implementation Plan (SIP) submitted by the Arizona Department of Environmental Quality on January 23, 2012. This revision consists of the second ten-year maintenance plan for the Payson air quality planning area for the national ambient air quality standards (NAAQS) for particulate matter less than 10 microns in diameter (PM 10). EPA is approving this plan based on the conclusion that the plan adequately provides for continued maintenance of the PM 10 NAAQS in the Payson area through 2022. EPA is taking this action pursuant to those provisions of the CAA that obligate the Agency to take action on submittals of revisions to SIPs. The effect of this action is to make the State's continuing commitments with respect to maintenance of the PM 10 NAAQS in the Payson area federally enforceable for another ten years. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Payson PM10 Air Quality Planning Area (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze State and Federal Implementation Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze State and Federal Implementation Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is approving a source-specific revision to the Arizona state implementation plan (SIP) that provides an alternative to Best Available Retrofit Technology (BART) for the Coronado Generating Station ("Coronado"), owned and operated by the Salt River Project Agricultural Improvement and Power District (SRP). The EPA has determined that the BART alternative for Coronado would provide greater reasonable progress toward natural visibility conditions than BART, based on the criteria established in the EPA's Regional Haze Rule. In conjunction with this approval, we are withdrawing those portions of the federal implementation plan (FIP) that address BART for Coronado. We are also codifying the removal of those portions of the Arizona SIP that have either been superseded by this approval of the SIP revision for Coronado or by previously-approved revisions to the Arizona SIP. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze State and Federal Implementation Plans (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze State and Federal Implementation Plans - Reconsideration (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze State and Federal Implementation Plans - Reconsideration (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is taking final action to approve a source-specific revision to the Arizona state implementation plan that addresses the best available retrofit technology requirements for the Cholla Power Plant (Cholla). The EPA finds that the state implementation plan revision fulfills the requirements of the Clean Air Act and the EPA's Regional Haze Rule. In conjunction with this final approval, the EPA is taking final action to withdraw the federal implementation plan provisions applicable to Cholla. This also constitutes our action to address petitions for reconsideration granted by the EPA related to Cholla. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze State and Federal Implementation Plans - Reconsideration (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Revised Format for Materials (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Revised Format for Materials (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is revising the format for materials submitted by the State of Arizona that are incorporated by reference (IBR) into the Arizona State Implementation Plan (SIP). The regulations affected by this format change have all been previously submitted by the State of Arizona and approved by the EPA. This format revision will primarily affect the "Identification of plan" section, as well as the format of the SIP materials that will be available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office. The EPA is also adding a table in the "Identification of plan" section which summarizes the approval actions that the EPA has taken on the non-regulatory and quasi-regulatory portions of the Arizona SIP. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Revised Format for Materials (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Air Quality State Implementation Plans - Approvals and Promulgations - New Hampshire - Infrastructure Requirements for the 2010 Sulfur Dioxide National (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - New Hampshire - Infrastructure Requirements for the 2010 Sulfur Dioxide National (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is approving elements of State Implementation Plan (SIP) submissions from New Hampshire regarding the infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 sulfur dioxide National Ambient Air Quality Standards (NAAQS). EPA is also updating the classification for two of New Hampshire's air quality control regions for sulfur dioxide based on recent air quality monitoring data collected by the state. Last, we are conditionally approving certain elements of New Hampshire's submittal relating to prevention of significant deterioration requirements. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - New Hampshire - Infrastructure Requirements for the 2010 Sulfur Dioxide National (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Air Quality State Implementation Plans - Approvals and Promulgations - Texas - Revision of Federal Implementation Plan Requirements (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Texas - Revision of Federal Implementation Plan Requirements (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is finalizing withdrawal of the federal implementation plan (FIP) provisions that require affected electricity generating units (EGUs) in Texas to participate in Phase 2 of the Cross-State Air Pollution Rule (CSAPR) trading programs for annual emissions of sulfur dioxide (SO 2) and nitrogen oxides (NO X). Withdrawal of the FIP requirements is intended to address a decision of the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) remanding the CSAPR Phase 2 SO 2 budget for Texas to the EPA for reconsideration. With this action, the EPA is also determining that, following withdrawal of the FIP requirements, sources in Texas do not contribute significantly to nonattainment in, or interfere with maintenance by, any other state with regard to the 1997 national ambient air quality standard (NAAQS) for fine particulate matter (PM 2.5). Accordingly, we are also determining that the EPA has no obligation to issue new FIP requirements for Texas sources to address transported PM 2.5 pollution under Clean Air Act (CAA) section 110(a)(2)(D)(i)(I) with regard to that NAAQS. Finally, the EPA is also affirming the continued validity of the Agency's 2012 determination that participation in CSAPR meets the Regional Haze Rule's criteria for an alternative to the application of source-specific best available retrofit technology (BART). The EPA has determined that changes to CSAPR's geographic scope resulting from the actions EPA has taken or expects to take in response to the D.C. Circuit's remand do not affect the continued validity of participation in CSAPR as a BART alternative, because the changes in geographic scope would not have adversely affected the results of the air quality modeling analysis upon which the EPA based the 2012 determination. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Texas - Revision of Federal Implementation Plan Requirements (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section
Approval and Promulgation of Implementation Plans - Designation of Areas for Air Quality Planning Purposes - State of Arizona - Boundary Redesignation (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approval and Promulgation of Implementation Plans - Designation of Areas for Air Quality Planning Purposes - State of Arizona - Boundary Redesignation (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking direct final action to approve the State of Arizona's boundary redesignation of the Hayden/Miami PM 10 nonattainment area into two separate PM 10 nonattainment areas: Hayden and Miami. EPA is also finding that the Miami PM 10 nonattainment area is attaining the PM 10 national ambient air quality standard, and, based on this attainment finding, EPA is determining that certain Clean Air Act requirements are not applicable for so long as the Miami area shows continued attainment of the standard based on current, publicly available, quality-assured monitoring data. EPA is taking this action consistent with obligations under the Clean Air Act to act on State redesignations. Lastly, EPA is correcting two errors in previous rulemakings that involved the designations of PM 10 areas within the State of Arizona. This book contains: - The complete text of the Approval and Promulgation of Implementation Plans - Designation of Areas for Air Quality Planning Purposes - State of Arizona - Boundary Redesignation (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section