Download Free A Methodology For Planning Land Use And Engineering Alternatives For Floodplain Management Book in PDF and EPUB Free Download. You can read online A Methodology For Planning Land Use And Engineering Alternatives For Floodplain Management and write the review.

This research presents a computer-based scheme for evaluating land use and engineering alternatives for flood plain management and includes a test application. The management alternatives considered in the report include spatial and temporal distribution of urban land uses, site elevation through dirt fill, flood proofing, open space, public land acquisition and engineering measures. A linear programming approach is employed for the study. (Modified author abstract).
A flooding river is very hard to stop. Many residents of the United States have discovered this the hard way. Right now, over five million Americans hold flood insurance policies from the National Flood Insurance Program, which estimates that flooding causes at least six billion dollars in damages every year. Like rivers after a rainstorm, the financial costs are rising along with the toll on residents. And the worst is probably yet to come. Most scientists believe that global climate change will result in increases in flooding. The authors of this book present a straightforward argument: the time to stop a flooding rivers is before is before it floods. Floodplain Management outlines a new paradigm for flood management, one that emphasizes cost-effective, long-term success by integrating physical, chemical, and biological systems with our societal capabilities. It describes our present flood management practices, which are often based on dam or levee projects that do not incorporate the latest understandings about river processes. And it suggests that a better solution is to work with the natural tendencies of the river: retreat from the floodplain by preventing future development (and sometimes even removing existing structures); accommodate the effects of floodwaters with building practices; and protect assets with nonstructural measures if possible, and with large structural projects only if absolutely necessary.